Diversion of 12.2765 ha of forest land for construction of 220 KV LILO line from existing 220 KV TTPS-Joda DC line to existing 220/33 KV Grid Sub-station at Ranki, Keonjhar under Keonjhar Forest Division by OPTCL. |
STAGE - 1 |
01 Apr 2026 |
No file available
|
| 2 |
Diversion of 6.720 ha of forest land for construction of Analjodi H.L. Bridge of Mathili Tahasil and Maharajpalli H.L. Bridge of Kalimela Tahasil in Malkangiri District by the Executive Engineer, NH Division, Jeypore. |
STAGE - 1 |
05 Feb 2026 |
No file available
|
| 3 |
Diversion of 9.243 ha (originally proposed 12.330 ha) of forest land for construction of Lapanga-Brajrajnagar 132 KV/DC line from Lapanga GSS to Loc No.51 and 220 KV/DC Budhipadar-Aditya Aluminium line from Loc No.23 to Loc No.54 from the premises of M/s NLC India Ltd. by OPTCL. |
STAGE - 1 |
24 Dec 2025 |
No file available
|
| 4 |
Modification of Stage-I conditions pertaining to the proposal
(FP/OR/TRANS/405424/2022) for diversion of 4.078 ha of forest land for construction
of 132 KV Transmission Line from 132/33 KV Grid Sub-Station, Rairangpur to
proposed Railway Transmission line Sub-Station (RTSS), Rairangpur in
Mayurbhanj District, Odisha by OPTCL. |
STAGE - 1 |
14 Nov 2025 |
No file available
|
| 5 |
Diversion of 1.839 ha of forest land for construction of proposed 220 KV D/C transmission line from existing 220/132/33 KV Grid Sub-station at Pratapsasan in Khordha District to proposed 440/200 KV Grid Sub-station, Paradeep at Ersama in Jagatsinghpur District by M/s OPTCL. |
STAGE - 1 |
21 Oct 2025 |
No file available
|
| 6 |
Diversion of 4.519 ha of forest land for construction of proposed Rail Corridor in village Kadei under Tangi Choudwar Tahasil of Cuttack District in Cuttack Forest Division by M/s My Home Industries Pvt. Ltd |
STAGE - 2 |
07 Oct 2025 |
No file available
|
| 7 |
Diversion of 10.750 ha forest land for construction of 132KV two phase DC line from existing 132/33 KV Grid Sub-station at Bangiriposi to proposed RTSS at Bhanjapur by OPTCL. |
STAGE - 2 |
29 Jul 2025 |
No file available
|
| 8 |
Diversion of 17.088 ha of forest land and re-diversion of 1.193 ha forest land (out of already diverted forest land of 17.240 ha in Utkal B-2 Coal Block of M/s. Monnet Ispat & Energy Ltd.) in favour of M/s. Jindal Steel & Power Ltd. for establishmnet of a 1050 MW Coal fired Thermal Power Plant in village Malibrahmani of Angul district of Odisha. |
STAGE - 2 |
28 Jul 2025 |
No file available
|
| 9 |
Diversion of 7.102 ha of Rvenue Forest land for diverting 220 KV Budhipadar-Basundhara transmission line from Location No.59 to Location No.75 from the premises of STPP, Darlipali, NTPC Ltd. in Sundargarh district, Odisha by M/s. Odisha Power Transmission Corporation Ltd. |
STAGE - 2 |
10 Jul 2025 |
No file available
|
| 10 |
Diversion of 2.833 ha of forest land in favour of RWSS Division for construction of Water Treatment Plant (WTP) for the project “Execution of Rural Piped Water Supply Project” pertaining to 42 GPS of Rairakhol Block in Sambalpur Division of
Sambalpur District of Odisha. |
STAGE - 2 |
25 Jun 2025 |
No file available
|
| 11 |
Diversion of 6.098 ha (15.069 Ac.) of forest land for improvement of Road from Kharabhuin PWD road Chhak to Khandahata P.S. Road, Via Sankulei, Ghantabania, Panasputuli road for the year 2018-19 by the Superintending Engineer, Rural Works Division, Boudh. |
STAGE - 2 |
14 Jan 2025 |
No file available
|
| 12 |
Diversion of 0.992 ha (online proposal applied for 0.966 ha) of Revenue Forest land in Boudh District for installation of pipeline for drawl of water from river Mahanadi to Boudh Distillery by M/s. Boudh Distillery Pvt. Ltd. |
STAGE - 2 |
31 May 2024 |
No file available
|
| 13 |
Diversion of 7.107 ha of forest land for widening and strengthening of road from Karanjia-Khiching via Singada road from 2/350 Km to 25/840 Km in Mayurbhanj District by the Superintending Engineer, Rairangpur (R&B) Division, Rairangpur |
STAGE - 1 |
21 May 2024 |
No file available
|
| 14 |
Diversion of 10.750 ha forest land for construction of 132 KV two phase DC line from existing 132/33 KV Grid Sub-station at Bangiriposi to proposed RTSS at Bhanjapur by OPTCL. |
STAGE - 1 |
24 Apr 2024 |
No file available
|
| 15 |
Diversion of 0.202 ha (0.500 Ac) of Revenue Forest land for establishment of Maitree Vihar Police Station in Mouza-Jaydev Vihar under Bhubaneswar Tahasil of Khurdha District by GA & PG Department. |
STAGE - 1 |
24 Apr 2024 |
No file available
|
| 16 |
Diversion of 0.700 ha of forest land for proposed Water Conductor System from Mandira Dam to Power House Point of M/s. GEDCOL Sail Power Corporation Limited in Sundargarh District, Odisha. |
STAGE - 2 |
24 Apr 2024 |
No file available
|
| 17 |
Diversion of 2.833 ha of forest land for construction of Water Treatment Plant (WTP) in Sambalpur District by the Executive Engineer, RWSS Division, Sambalpur. |
STAGE - 1 |
23 Feb 2024 |
No file available
|
| 18 |
Diversion of 4.046 ha of forest land for construction of Water Treatment Plant (WTP) in Jharsuguda District to be executed by Executive Engineer, RWS&S Division, Jharsuguda. |
STAGE - 2 |
31 Jul 2023 |
No file available
|
| 19 |
Diversion of 0.659 ha of forest land for construction of MS/HSD retail outlet of M/s. Jai Filling Station at Pakhara under Dharmasala Tahasil of Jajpur District in Cuttack Forest Division. |
STAGE - 1 |
03 Jul 2023 |
No file available
|
| 20 |
Diversion of 0.700 ha of forest land for proposed Water Conductor System from Mandira Dam to Power House Point of M/s. GEDCOL Sail Power Corporation Limited near Laing village under Rourkela Forest Division of Sundargarh District, Odisha. |
STAGE - 1 |
20 Apr 2023 |
No file available
|
| 21 |
Diversion of 6.098 ha (15.069 Ac.) of forest land for improvement of Road from Kharabhuin PWD road Chhak to Khandahata P.S. Road, Via Sankulei, Ghantabania, Panasputuli road for the year 2018-19 by the Superintending Engineer, Rural Works Division, Boudh. |
STAGE - 1 |
18 Jan 2023 |
No file available
|
| 22 |
Diversion of 7.043 ha of Forest Land for widening and strengthening of Raruan-Fagu-via-Ghagarbeda Road from 0/000 Km to 25/000 Km in the District of Mayurbhanj by the Executive Engineer, Rairangpur R&B Division. |
STAGE - 1 |
25 Oct 2022 |
No file available
|
| 23 |
Diversion of 4.046 ha of forest land for construction of Water Treatment Plant (WTP) in Jharsuguda District by the Executive Engineer, RWS&S Division, Jharsuguda. |
STAGE - 1 |
06 Apr 2021 |
No file available
|
| 24 |
Diversion of 2.428 Ha Forest Land for construction of Water Treatment Pant(WTP) under Champua Tahsil of Keonjhar District. |
STAGE - 1 |
17 Mar 2020 |
No file available
|
| 25 |
Diversion of 0.992 ha (online proposal applied for 0.966 ha) of Forest land for drawl of water from river Mahanadi to Boudh Distillery by M/s. Boudh Distillery Pvt. Ltd. |
STAGE - 1 |
04 Dec 2019 |
No file available
|
| 26 |
Diversion of 2.023 Ha Forest Land for construction of Water Treatment Pant(WTP) under Rairakhol Tahsil of Sambalpur District. |
STAGE - 1 |
15 Oct 2019 |
No file available
|